A Peak in delivery, make the staff fatigue. The resignation is quite high, the recruitment of HR ไม่ทันตาม needs new employees, so no skill. And the staff that worked out according to the rate plan. Make period Load goods increased. Result in an opportunity to make a box will collapse than normal box temperature and some not. A stripping of the box when the Unload.New staff didn"t follow the step placed, such as loading, from the side to the middle. Using nine again to load the goods the row is quite high. And the new employees do not pay attention to check the box during loading, such as check box on the back through the stainless steel sheets on the conveyor belt to send the box. Do not have the box are mixed.
การแปล กรุณารอสักครู่..
