Vertical steam pipe Drainage during construction of the foundation must be Factory Building with Wall. ITE estimate by the construction of vertical pipe with the pipe does not impact (there are enough spaces for construction). If the trend of the Steam pipe is not making enough footing and Drainage system we adjust prices based on the actual work that disable sleep.
การแปล กรุณารอสักครู่..
