. HistoryAirports have established during World War II, the 2 on land of the air force and the royal treasury The government reserved the airport ไสำ for. The livestock by called "fields of hope."2 Japanese army could improve suburbs such as the runway for the up - down temporarily of the dispatchers. To the mission of Japanese army later. When the war ended, the air force used the areas such as the up - down.It is called "the airport field hope." Which has improved continuously into a commercial airport of Trang. B.Professor 2497
communications, has announced that 2 / 2497 dated 13 September 2497 airport such as airport allowed years B.2498 Civil Aviation Department (formerly called the office of civil aviation, and upgraded to the Department of บินพาณิชย์ on 27 November. The 2508), the restoration of the airport. To make the aircraft of Thai Airways Company (cribriform plate) flying passengers, goods, postal shuttle between Trang - Bangkok and nearby provinces. By updating a paved runway surface - asphalt, length, 1175 meters width 30 meters and adjust the runway for size 30 x 60 meters. Both sides, which is a gravel packed Along with the construction of aviation station building, which is 2 wooden house floor consists of the posture, air craft, the Thai Airways CompanyIn the same by grinding.Use of aircraft model Da chic Da (D.C.-3) passenger services, but is open for too long. It is necessary to stop the run. But there is still a military aircraft to fly up - down time year 2507
.Civil Aviation Department (Office of civil aviation), the restoration of the runway to repair grinding. Can open to passengers again. The aircraft, Avro 748 (AVRO.- 748). However, due to the runway the actually size less than a standard said is a wide 20 meters long, 800 meters only. Cause safety problems. So crushed.Have to stop the process again. However, military aircraft still flying up - down all the time as in the previous year.2537 has improved airports again to support the increased air transport and the number of passengers increased
. Which consists of a
1. Building bus shelter after a new area of about 3 000 square meters, 2
.The construction of the original 1 runway, runway length 500 m
expansion size 45X 700 meters to expand the runway width size 2 X 7.5, X 1400 meters construction pavement run runway for size 60 X 60 meters. The drive size 23 X 145 meters to expand ถนนทางเข้า construction and some parking lot Year2541 moved to the new building the airport bus stop and was declared a Airport Customs resources on 5 March 2542. At present, a long run, 2 airports100 meters wide 45 meters can accommodate aircraft size 150 seats (B 737), there are parking spaces, which can รองรับอากาศยาน medium has 2 ships at the same time.300 people
.
การแปล กรุณารอสักครู่..