The results of analysis by the economic analysis from investment costs and benefits derived from the travel time savings and a reduction in vehicle costs of the entire study area highway network. The analysis time is 30 years old by the time counter in the construction of 5 years starting from the year 2547, and the period of 25 years starting from the activation of 2552. economic analysis as follows:
การแปล กรุณารอสักครู่..
