If it is outside the system, such as by CGB Atilier 5.3 and 5.4, but that is not a copy of the information in the Production Order, and then Flex PLM Program is stored, for example, to keep the Division as evidence before the actual submission, Costing.
การแปล กรุณารอสักครู่..