Drilling equipment must be standardized before drilling be sure to use the correct position during drilling would have fallen in the line of defense material to the substrate.
The drill floor to standards before the drill floor have to make sure it's correct position ขณะทำการ drill must have the resistant material to fall on the ground floor.