The announcement No. 7/2557: Manual OC Operation System Phase 2 (V1), the C - Loan
You can verify the information from the operation in this case is called the Report Cal system in the system, so AM will perform validation information 2 times a month every Friday in week 2 and 4 months.There will also be a record verification results in Area Check list
การแปล กรุณารอสักครู่..
