We have made and sent to et1 Haier 20 the test status is now pending that would confirm what must be corrected or changed before the PT in my opinion. If there are any changes, such as the label is small, you can use the BOM calculation FOB Costed.
We have already made et1 Haier test 20 and sent to the state now is waiting to confirm whether or not to edit or change anything before the PT in my opinion. If the changes are minor, such as the label you can use to calculate the FOB has Costed BOM.
We do ET1, and sent Haier test 20. The status now waiting to confirm what need to fix or altered or before. PT in my opinion, if there is a change to a small impact, such as label you can use Costed BOM.FOB.