2542 June 22 when his Majesty King borom rat is thanop RA h.m., good irrigation Department and Secretary-General of the ATIP. Kapon. Irrigation Department officials and College kapon. To have my way to King and thuli aerosol present project progress reports due to initiative in the Northeast at the Palace distant concern. Hua Hin has a mixture of RA on irrigation in thanop Northeast. The project developed a unique basin on stemming from the initiative. Kalasin, Khao Wong District Department of irrigation operation. Is as follows: Construction diversion tunnel), water from Huay Pai reservoir. Amphoe Dong Luang, Mukdahan, come to plantations in the province of kalasin, Khao Wong district, affect areas of the Forestry Department, and if the construction of the Forestry Department, the area is damaged, replacement planting, Forestry Department. 2) of transmission reservoir water to Thailand with the hose to the end of the reservoir Huai phai. Consider a new format that saves over the water, the area has a small area, parallel to the bamboo, such as Lam as well as the wide range of irrigation in the FAI Lam phai and water rin from the reservoir to fill a page of Huai phai dam instead. 3) to raise the level of catchment basin is also now on the Lam PA Khao WONG, kalasin is better because in this area there are no large-scale sources of catchment. Mueaykra fire water entrapped, if not full, diversion of water pipes, consider ang from the water diversion tunnel from the reservoir, fill Huai phai. If the three cars per pipe.
การแปล กรุณารอสักครู่..
