The implementation of ERP used in the organization have the possibility to take charge over the limit. And use time period than as specified in the project. Due to the applied into effect (Implementation) takes a long time and everything., (Davenport1998), but this does not mean that the system ERP Package bad design, but means understanding ERP system both the system and the working process of the modified business must comply with the system. ERP to comply with the time and expense to plan.(2000) estimates that 94 percent of projects ERP failed in Table 1 is essential points that cause failure!
การแปล กรุณารอสักครู่..
