Raw material preparation stage: after the wash step, Kaffir lime leaves. Added a time machine from the drain 10 minutes is 15 minutes before entering the process.Blowers
The process of preparing the material after the process of clearing leaves. Add a machine drained from 10 minutes to 15 minutes before entering into the blower.
The preparation of raw materials: after washing steps, kaffir lime leaves. Add time into the drain from the 10 minutes 15 minutes before entering the process.Bellows.