In this case, the vendor is required to change it, without delay, and although it has been checked, then the vendor responsible for the delivery of machines and machine spare parts factory, tobacco in legitimate maps successfully, and a list of specific features in every respect without any corruption and sends the time. When the Board of Auditors wishes to know the source of production. Catalogue of the map any parts required to build the machines and spare parts vendors will be required to provide in accordance with their wishes, by checking that the manufacturer, are considered as preliminary investigation. Next, it must be a number of conditions and test drive and test the performance in countries, Thailand again. The Board of Directors, which the tobacco plant formation. If it appears that it is not based on a specific technical specifications. The seller will want to manage change successfully, first by the seller is free to all. When such an inspection Committee, and agreed with the tobacco plant is considered a complete check-in.
การแปล กรุณารอสักครู่..