The Cooling water pipe from the PPC to HDPE Plant at meetings and through together, lay the pipes thereof. South Street are only a portion of the Valve will be in the pond area of HDPE, but is under the soil and ponds CAP, Valve, it opens the botnon only.
การแปล กรุณารอสักครู่..