For 8 of 6,749,327.62 Baht (., Six million, seven hundred and forty-nine thousand three hundred twenty-seven baht sixty-two cents).
Condo C, Condo D
- Structural beams, roof / floor deck / mast deck / floor elevators. Deck (Roof Floor structure) Beam / Slab / Column / Lift (100%).
- the Wall Wall Finishing (Brick Wall 60% / Wall plaster 40% / Wall Tile 30%).
- Ceiling Ceiling (Gypsum board 30% /. plaster 40%)
- Floor Floor Finishing (Ceramic Tile 30%).
- Electrical rooftop Electric System (Electric Conduit 60% / Electric Cable 40%).
- Water systems rooftop Sanitary System (Drain & Airvent 40%.
'Swimming Pools
- Walls Wall Finishing (Structure plaster / Rc. Wall with Tile 4 "x4" / RC. Wall with Cement Trowelling Steel Plus Water Proof Solution) 100%.
- floor (Floor finishing) (Rc. Slab with tile 4 "x4. "/ Rc. Slab with Sandwash / RC. Slab with Steel Plus Water Proof Cement Trowelling Solution) 50%.
- Systems Swimming (Swimming Pool system) 70%.