Environmental (1) there should be close coordination between the agencies involved in the development of transport infrastructure in place so that policy initiatives and projects with consistency and clarity in the procedures implemented
. (2) there should be an operation of publishing information and news about the project, and to listen to the opinions of the people in all stages of project development, continued to achieve recognition, an understanding is required. And acceptance of the project
(3) the current social condition problems, theft and destruction of property, the Government generally has seen. Therefore, it is important to plan early in the design stage in order to prevent the problems that can be prevented. (4) the person responsible for environmental management within the highway service centre should be the same as the agency responsible for managing special political line of Highway. This is to provide more effective governance
. (5) development of a project should be executed in accordance with the procedure of environmental impact studies and incorporate measures to reduce the environmental impact from the planned study stage. The survey design. Are monitoring and evaluation, both in the construction and operation phases to bring the result of problem solving and improve operation efficiency project
? (6) in the environmental impact study should consider the factors that are associated with the development project. So they proposed measures to prevent and correct the effect can be covered both in the construction phase and operation phase. EIA is fully operating concretely
. (7) while continuing to study the suitability and environmental impact. There must be coordination between operations, engineering studies and environmental studies. For more information about the features in the project continuously.
การแปล กรุณารอสักครู่..