The problem of excessive production.1. waste of time and labor to produce that is not necessary.2. loss storage space WIP3. the relocation occurred.4. waste is not resolved immediately.5. sinking costs.6. obscure production problems.
The problem of excessive production of one. Time consuming and labor are not necessary to the production of two. A waste of space to store WIP 3. the transport 4. Waste not fixed immediately 5. Sunk costs 6. obscure production problems.
The problem of producing too much 1.? A waste of time and labor in production not necessarily 2. Waste space to store WIP 3. Moving 4 waste not corrected immediately, 5 . Sunk cost 6 hide production problems.