1. open the door, the electric control cabinet, then work 3 phase circuit breaker 15 Amp lifted (Maine Breakers), located ON to the electrical energy, with water cooling. 2. open the water supply valve for incoming water water water, wait until full water thaeng thaeng. The water level is controlled by the float. When the water is full the float will shut off valve in the water. 3. turn switch to Emergency power, with Water Pump control switch and sawit Compreessor. 4. open up Compreessor to Compreessor control, electrical work, wait for about 3-5 minutes Compreessor to remember the working and the temperature control must be kept at 24-25 C0 C0 when Compreessor works, watch the pressure gauge-side spike reagent, HI-Pressure side HI-Pressure R22 pressure cleaners R22 will measure 65-75 Psi. 5. open the water pump to the electrical energy, suat with Motor Pump Controller. Work. 6. open the valve, the water and the water valve behind the water cooler, so the cold water flow along the water hose at the water valve, remove during visit to the templates that are installed with the injection machine and the water flows back to the valve inlet and the water is circulating thaeng works like this forever until you shut down. 7. If an employee followed the 1-6 and then the machine does not work to call technicians to check.
การแปล กรุณารอสักครู่..
