The installation of clean technology, it may be inappropriate to actually work within the line of frozen may cause delays in cleaning the raw material. Therefore, there should be coordination with the head of the main talking points to the objectives of the programme to reduce the loss of water during the production process, and to report directly to the Chief of staff on the use of water-saving and how.
การแปล กรุณารอสักครู่..
