Contractors must be prepared to drain underneath the wooden floor before installing the flooring, wooden flooring, plaster, sand pouring outside, such as adjusting the level of polishing it.
The Contractor shall prepare drainage under the wooden floor before the installation of wooden floor exterior, such as cement, sand เทพื้ on volume of polishing it.