to produce RF-640/A VS-i mass production as plan. To start GS-24 Production as planed.(Infrastructure,D-Shop,PD2:16 units,Pre-production:20 units,Mass production 380 units) To achieve the KPI in cooperation with DGJ.
to produce RF-640/A VS-i mass production as plan. To start GS-24 Production as planed.(Infrastructure,D-Shop,PD2:16 units,Pre-production:20 units,Mass production 380 units) To achieve the KPI in cooperation with DGJ.
to Produce RF-640 / A VS-I mass production as Plan. To Start GS-24 Production as planed. (Infrastructure, D-Shop, PD2: 16 units, Pre-production: 20 units, Mass production 380 units). To Achieve the KPI in cooperation with DGJ.
To produce RF-640 / A VS-i mass production as plan. To start GS-24 Production as planed. (Infrastructure D-Shop PD2:,,, 16 units Pre-production: 20 Units Mass production, 380 units) To achieve the KPI in cooperation with DGJ