Certificates from those with documents and evidence, data and rights. In comments to local persons per officer nearby about the construction, alteration or operation of project or venture. In the case of a building construction project or undertaking or modifications. The building does not need to prepare a report analysing the environmental impact or the impact analysis report. Introduction to environment (9), but the building is a building control section 32 categories, depending on the basis. How to wax the Board control and nguean building set.
การแปล กรุณารอสักครู่..
