The attached file is a table, design conditions and mine ponds, mining costs in 2010-2016, which I check calibration.And preparing for the geological maps as the data contained in the 2014-2016 continue.
Attached is a table conditions pit design and cost of mining at the years 2010-2016, which I am revised geologic mapping and are prepared to engage as much as I would have in the years 2014-2016.
The file attachment is a table design condition pit mines and cost mining years 2010-2016 which I"m checking and adjusting.Preparing the earth and map to assemble as any information in 2014-2016 next.