Inspection and maintenance access
, maintenance , inspection and record the results on a regular basis. Check oil level and temperature of the coolant in the transformer. Check the dust Aerosols, metal Leakage Current Environment is at the proper temperature. Not too hot or crowded, cramped prevent overheating. Check with the dynamometer to ensure that the size of the electricity used not overload the machine. Cables and cleaning equipment regularly. Do not modify the condition of the machine or equipment cables - grounded , be sure the machine is connected to the ventilation and cooling fan built in. And to use practices for the welder to check the welding cables outside every day. Recording and reporting anything unusual set of wires. And related equipment such as welding equipment and wire handle. Header Connector or heat insulation measures or other defects be sure. Fitting connectors and contacts are always tight. Clean, inspect cables and grounding. The occurrence of damage or leaking applications properly. No modification of the welding wires or other devices. If the malfunctioning of the equipment. Immediately changed once the welding current consumption is very high. Power lines must be resistant to the maximum usable if there is a problem. Or there is something wrong Should the machine breaks And notify the relevant authorities to immediately repair Check cables for loose wire of the head, or the head of the burns. Or rupture of the device overheating. And damage to the cable. The head unit and connect ground wire to hold firmly to the workpiece with a workpiece (Ground Clamp) and measures of power, such as 300 amps, 500 amps, so be sure. Electric wires and cables, whether the ground can bear the highest electricity use.
การแปล กรุณารอสักครู่..
