In the present work. To move the goods from the area, waiting for delivery to the delivery of the goods. Have the path moved the following item from an image when an employee acts as warehouse shipment orders of finish store? Employees check the crates of goods (Checker) to drag a cart crates of goods into the area, waiting for delivery of the goods, delivery will be required to reach that area awaiting delivery (point B) to lead trolleys crates of goods line is moving to the delivery area delivery (point A), at 10.Task and delivery of the goods will have to walk to the point B will need to walk through the back channels, shipment (Block) in which this channel will have the authority and the ins. Store and fill crates by jack lang with the Hand moving the shipment at any time. Making the corridors behind the shipment with all employees check the crate the goods stored and the ins employees and employees operating in this area are delivered in all three departments, as a result, operational interruptions. Causes of delays in the process and if the cart crate items collide. May make the product is damaged. Result in the branch receives the goods according to your needs.
การแปล กรุณารอสักครู่..
