Researchers have released a maintenance plan for the machines used in the factory case studies from August 1 – September 30, 2013, by making the inspection and maintenance based on the planned. I found that the Is zero. A readiness rate is 100%, because the machine has not been damaged any
.
Then, in November, 2556 (2013) onwards Researchers have broadcast system maintenance the machine factory case studies be carried out manually, and then stores the performance for a period of 4 months: November. – The month of January, 2557 (2014) to bring up compared to before you can use the system maintenance. I found that there are a number of times, or the frequency of machine breakdown is equal to 2 times the average equal to a rate of 99.89% is increased from 0.89% of the original value, the average time during the machine's damages equivalent to the expense, causing minute due to failure of the machine equal to 26,345 X baht coming from the backing parts of the security and strong wage and overtime after any possible projects arising from preventive machine maintenance that is incomplete. Moreover, the factory case studies lack the personnel responsible for the direct system
.
System maintenance, preventive machinery to apply there must be compliance with the plan and the standard Microsoft Excel program was placed in strictly to reduce failure of the machine to zero. The need to give priority to the inspection and to record the machine history
.
การแปล กรุณารอสักครู่..