I'm a construction project management Learning center through AIA, we would like to clarify the scope of the information that has been provided and installed at the site, which is based on the we follow your wanat Raja. Is as follows:-Telephone system installation of pipes and cables (cat6A), install telephone outlet (RJ45 type), where all the wires to the HUB of each class room. -LAN Install the hoses and cables (cat6A), install a data outlet (RJ45 type), where all the wires to the HUB of each class room. -Cabinet/Rack 42 U 1 Data layers with a Patch panel for the telephone system and DATA at the HUB of systrm.-Pipes and cables (cat6A) for each position of the Access Point (AP) to the HUB of each class room.Boen system cables above the installation is within this week and will have tests on Monday, October 5, the contractors by the IT team. Can check together in these days.If possible, we would like to invite you to attend a meeting with the team, including design and construction (MTL) For further information and understanding to achieve a match that has been placed on the agenda of the week that sathorn AIA building, 2nd floor, A. Time is 14.00 hrs. Wednesday, September 30, or a date and time convenient to you Chittinat.
การแปล กรุณารอสักครู่..
