Design, design consultant, Rails system according to the principles and standards for designing geometry (Geometric Design Criteria) in heading 5.2 rail design on the project would be the construction of a new rail trail is a level floor (At grade Railway) used the system Rails, Ballasted Track, as shown in Figure 5.3-1 except the community will be the rail and bus system runs an elevated rail Track Ballastless as shown in Figure 5.3-2 this is the table used in the project, the consultant proposed a Rails UIC 54 throughout the project.