4. If the requirements of the external environment and the size of the raw material that is not specified in the standard references, respectively, according to the Drawing and.Do consult with your supervisor or higher level Leader Reviewing every time before it is assigned to the Inspection report.
การแปล กรุณารอสักครู่..
