For the suitability of the construction area in project implementation. Checking in a matter affecting the project.• Urban management law, the location of the project that have not been identified or designated as prohibited areas in the construction of a factory for assembling air conditioners, which normally if there is no construction is clearly prescribed.• The electricity cable size. The location of the project. The project location was found to have a high-voltage electricity cables. Adjacent to the factory area• The water source from the location of the monitoring project. I found that the project location, adjacent to the Canal, and there are also wells groundwater in the project area.• Transportation from the monitoring location of the project. I found that the project area is not too far from the port of Laem Chabang. Approx. 10 km.When examining and considering the suitability of the location, and then found that the area is used as a construction site, it is appropriate to continue the project without any impact or jam.