After that, it's a concrete footing and then pouring steel and pouring concrete to make a lean levels. After that, the steel beams to make a poster of the first layer and then pour the concrete into the.
Later in the steel and cement and poured the footing lean. To adjust the concrete After that, the steel beams to the columns of the first floor and cement into the series.
And then into a steel and concrete and the pouring of footing lean. Concrete to adjust level. After the steel beams and pillars of into class and pouring concrete into the model.