The first channel is the rain and water used in daily life of employees in the factory. This will drain out into the public channel in front of the factory, there were 3 pipes.
.
.The second channel water drained water used in the production of the factory, the defendant, 1st muster on the left side of the factory, there were 1 pipe.By the defendant, 1 to 5 believe in good faith all along that the defendant, 1 are right, pipelines and paint water such as the book of consent you chaiyong. Jane king. The ownership land originally agreed with the defendant, 1
.The first channel and the second channel
the defendant, 1 use drainage factory is normal, since opening the year ๒๕๓๔ details appear on record copy document end statement number. H
.
การแปล กรุณารอสักครู่..
