Summary of Mr. Lee Graham home page 1. window (front cutting 250 mm.) 1.1 the edges with wood from the edge off BOA in 10 mm. 1.2 installation 50 mm from the outer edges on the band. 1.3 Handle in the middle of the Sash every bloom. 1.4 mirror bathroom (uWNN3D1, uWNN3D2) using the glass frosted.Insect screen -10 mm away from the edges of panels. -The measure of 10 mm from the edge in its pages, not because the page has no mortar. Expected size is likely to be equal to the circle on it. -Measuring Handle phase margin page now, but there are no actual window Handle from the nets in the frame spacing may change. UW2-Windows (with fixlight side) is not yet sure what to stick only to the nets full <<< or sliding door chat with Simon again one at a time.2. the doors (front cutting 250 mm.) 2.1 installs a 30 mm away from the frog outside. 2.2 closing the door edge with wooden BOA eat cement 10 mm into page space. 2.3 floor Finish 1100 mm high Handle. 7 doors. 2.4 fixlight <<< uDuNN1D1 door added to the above format, which is fixlight to chat with Simon again (sub 4 2 single pane, pane, pane.) 2.5 circle on the bottom, sink into the Finish floor 30 mm.Insect screen-Running away from the edges of the plaster 10 mm. -Measure the length buffer Handle.*********************************************************************************************Note -From 10 mm PU shot spacing. rest 5 mm. (due to differences in the size, width, and height of the plaster level about 7-10 mm). -Insect screen both the doors and Windows also does not confirm regarding the size and spacing. Speak with Simon and view the page after installation is another one at a time.
การแปล กรุณารอสักครู่..
