1. Turn off mold temperature control take system cooling out.
2. Get out Insert mold
3. Mesh mold by into the set mode. Mold and press the button On Mold set to find the position that Mold mesh fit without set Hi pressure
4. Remove iron clamp to seize the mesh mold
5.Take the chain of the crane to the camera clamp based on mesh mold
6. Pull up pull frozen hand crane
7. Tightening Nut out both Fixable and plate Moving. Plate.
8. Move Moving plate out to space to move mold out
9. Use cranes Mold down to take Mold up
1 used cranes, Mold. Up
2.To adjust the position Locating ring mesh with injection by to match the position. Center (using a ruler can measure parallelism of mold).
3. Based on the Fixable nut plate to
4. Move into Moving plate
5. Tightening nut. The remaining
6.Take the chains of the crane hook to clamp mold out
7. Remove the steel clamp based on mesh mold out
8. Move Moving plate out to put Insert. Mold
9. Cooling system by considering the direction of flow to flow out of the water.
- 10. Turn mold temperature control
.