To select the Use liquid pipe size regardless of PIPE DIAMETER 1.
. The diameter of the pipe cleaners PIPE LENGTH
2. The length of the pipe cleaners 3 NUMBER OF FITTINGS.
. The number of joints such as elbow
4 FLUID VELOCITY. Moving speed of the cooling substance
Use pipe cleaners should be selected according to the air conditioning installation manual, but if you don't know, you can find a little bit of size from the chart calculates size pipe cleaners, which generally determine the pressure falling across the vacuum (Suction Line Pressure Drop) 2 PSI per 100 FT. (Discharge Line PressureDrop) 4 PSI/100 FT.
In addition to the liquid pipe size selected is correct. The pipe cleaners to do was another with everything to make a working efficiently, such as pipe cleaners, and good housekeeping. Back to the compressor by so golden in the installation housing and Eva Rae in a sufficiently different, regardless of the
.1. installing a host out Eva under Golden icons, racing fuel will result in the compressor, the compressor because of the low back is higher, so the pipe the suction pressure, regardless of the cross and oil issues fell back by
2. Golden icon installation housing is lower than low a Eva resin pressure will result in the agreement because of the compressor. Soft cleaners at the high side, so, regardless of the delivery pipe pressure dropped from friction and cross the vertical pipe in
.The pipe cleaners the vacuum when the placement fair Eva si Golden icon and choosing is in different ways as follows:
1. When the Golden North is sufficient for their si Eva Rae.
.To do that hold oil (Oil Trap) To make sure that the oil is flowing in the system with up to one. WordPress services Made to prevent oil should make a near enough Eva resin as possible
2. When the Golden North is their si Eva enough oil to make it affordable for us at every height range 4.5 m. To remove oil entrapped in a while that the compressor starts again. Oil from the oil that collects will be absorbed into lubrication optional. WordPress services immediately (in a vertical pipe should not exceed 15 m)
.The pipe cleaners to cooling system exceeds 10 metres shall fill more lubricant to compensate for the effect of surface residual oil film inside the vacuum pipe according to following table rate per 1 meter length each and every walk. OIL SIGHT GLASS (if any) to be in the range of 1/2 to 3/4 of OIL SIGHT GLASS
.Pipe size gas rate per every 1 metre length
3/8 7.5 mm (z-c) 1/2 10 mm (z-c) 5/8 20 mm (z-c) 3/4 30 mm (z-c)
7/8 40 mm (z-c) 1-1/8 to 50 mm (z-c)
when pipe cleaners through the walls,Wall insulation should be wrapped or which can reduce vibration. Best side suction must be insulated along the length of the pipe. This pipe insulation cover used must have a thickness of at least 1/2 inch pipe is usually the delivery does not need to be insulated. High temperature boiler rooms, or in the middle of the summer sun, supplied with rubber insulation should be used with a thickness of at least 3/8 inch top encrusted with and need to add the thickness of the insulation the suction is thick with at least 3/4 inch
.
Sewer installation.Sewer is an important part of the section. If a bad installation may result in water cannot drain off and trapped in the machine until the overspilling external damage to the area surrounding air. Sewer pipe will be used for the most part S-LON PVC pipe? Sewer should be insulated where possibly there is a condensate pipe in the ceiling. In addition, sewer TRAP should be made with the
.Maintenance of the air conditioner so that
is working out and have a long service life, it should be regularly maintained maintenance regularly. There are hints about maintenance as follows:
1. Regularly check and clean the air filters of the fan coil unit every two weeks
2. Eva Panel enough resin to a coil and a golden icon Sir coil should be cleaned 3-6 months at a time
3. Fan motor and a fan coil unit and the unit's Golden icon must be inspected every 6 month and lubricating grease or oil drops by regularly cram
4. Check the water tray, it Cleaning the wastewater flow so as to perfectly
5. Check the wind direction out of the fan coil unit. Must not contain materials off the wind path
6. Check and repair the insulation, pipe cleaners, which continued during the unit's Golden icon and a fan coil Unit
7. Check Windows and doors that have a leak causing hot air from the outside into the building or
8. Contact a trusted changborikan to check at least twice a year, air conditioning help.
save
.Electricity consumption in households, or approximately 60% of office building will be applied to HVAC systems. Therefore, if you use a low-efficiency air conditioner or heat leaves occur inside the room without. Not need to invest and invest a little bit, which is a result of the operation will not cause an. Discomfort from using air conditioners must be reduced but will reduce electricity bills down by normal methods of saving are the following:
.Selecting the appropriate air
1. Select high-efficiency air conditioning is very cool but less power by looking at eating a power w or mopdoi should be selected with less or see COP or EER values (Energy Efficiency Ratio), which is higher up the better
2. Select the proper size air conditioning with
3. Select the device temperature control or thermostat satat high precision, such as Thermo satat. Electronic type
4. Change air conditioning replacement air conditioner is old, low-efficiency due to long use. To change a new powerful machine should be considered to reduce the heat from outside
.To reduce the heat from the outside air to pass through the area and also through walls, roofs and floors based on textual, as follows:
1. Reducing heat through walls
1.1 wall mirror is one thing the heat from outside can spread into many. There are several ways how to fix
1.1.1.
การแปล กรุณารอสักครู่..