There is a problem with an employee belonging to the production jump in buan resigning. Therefore, do not have sufficient manpower to produce a spray side to LH RH, thus resulting in non-optimal performance.
Staff at the mine have determined the production resign. Inadequate manpower Thus producing an alternating spray with RH side LH As a result, the operation is not fully effective.
The employee shall บวณ production resigned, manpower is not enough, therefore, produce a spray on RH switch with LH thus resulting in practice effectively.