Introduction to HR planning policy does not Hold iron storage stack to add a roll no and ask them to summarize information using steel and steel, McTric and finish by GEL within 1 month.
Suggest that the HR policy of not Hold the iron in order to not accumulate. And ask for a detailed summary of the use of iron and steel schedule by requiring GEL McTric and completed within 1 month.
Suggest HR policy in the lockup steel Hold to do not accumulate. And let the summary details of the iron and steel McTric GEL scheduled to deliver and the 1 within months.