Punching the walls in front of the room to pipe water main points
. Your suite owners and residents Building the khathuk you
With a corporate condo lake view condominiums Building the Lake to commence drilling the wall in front of the room to pipe water main points of global development initiatives by improving the building. # 2/56 on Saturday, May 2, 2013, by determining the operation every Tuesday and Thursday of the 2557 (2014)
March. Such operations. It is necessary to work on the series and should be a part of the surveillance and dust inside the room. Nitibukkhon with delivery receipt form Allowed actions to every room Returned nitibukkhon within March 15, 2014 if the date and time that have been defined. Owner, acknowledged that it must bear the expense burden. In such an action.
In the section of pipe concept within the room. If the owner of any room. To change the horizontal pipes inside the room. It connected to the pipe on the outside of the global domain to install separate water meter can contact designs.
Nitibukkhon.
It published to know generally.
best regards,
(Mr. Suchart Ariyachatiphadungkit)
. Corporate Manager, Lakeview condo condominium
Building the Lake
การแปล กรุณารอสักครู่..
