Crack the tiles dropped due to the need to repair by Ron to do repairs on Tuesday May 3 onwards by 2559 perform repair level 4 before after it is executed from the top layer down to the ground floor, respectively.
Because the tiles Disintegration need repair Repairs will be made on Tuesday, May 3, 2559 onwards will repair the top 16 after the first operation from upstairs downstairs, respectively.
Since tile broken disintegration need to repair, the repair on Tuesday 3 may 2559 onwards. By the I 16 repair. After that is carried from the upstairs downstairs, respectively.