Dear littleCoordinate system interference electrical work according to the following details:1. electrical. Telecasting transformer. Backward (as attachment) on the electrical system, in which you at least have to power this story already. Therefore, you little pointer, such notification to you since Aye. Accounting Department will have to consider the following costs.2. the project has a Skylight installed transformer (the Main incoming). Real already. Therefore, to save the cost of the project is therefore asked to consider cancellation of the temporary transformer (Temporary Transformer) and switching to a real transformer.