FMEA is a tool for solving problems in the production process, to analyze the problems and effects of perdition, process failure factors [15]. The Risk Priority Number (RPN) is important in the FMEA method to evaluate a failure (failure) which contains 3 parameters are the Severity (S), Occurrence (O), and (D) Detection. Today it is the gauge that RPN has been popular in the FMEA risk evaluation, but not everyone thinks it is a good measure.
การแปล กรุณารอสักครู่..
