The construction of the steel before it is suitable for the production of drawn a lot at the same time, in the production system, the base structure of the tournament will be sent to bat more than 100 meters distance from the base of the concrete casting is to be cast in several pieces at the same time building elements system is used for the construction of the stake. The beam bridge or the finished floor. C. the steel pull strength.This is a way to cram in another way, which is used widely as well. Suitable for large structures, which are great for transporting or construction site, which is far more conduit pipe production plant and high strength steel wire will be within the casting of concrete building elements, with. Anchorage on both sides and then make a concrete pour. When hardened and there are high enough until the curing, so the voltage using a hydraulic jack c. Pull the iron out by concrete beams and confirm with a steel wire is stretched taut between both sides of the holder lever by in Anchorage device. We can make concrete with steel wire along the length of the lever by the mortar at the end side of the Jack into the pipe, conduit, until the tendon has been full of soft mortar is called bonded tendon tendon section that does not have a soft mortar in unbonded tendon lever called a conduit, which has bonded tendon is the behavior during overload better than unbonded tendon tendon lever which is normally one of the high strength wire or strand consists of several hundred in the same conduit pipes and equipment at the end of a beam is the maximum number of anchorage holes for the anchor wire strand or wire in the conduit.f
การแปล กรุณารอสักครู่..
