4. The scope of work and details of the work 4.1 scope
4.1.1 must be transferred Gear contractors set Box from all 3 believe. To Overhaul at the place Work shop contractors to install machinery and equipment according to the standard
4.1.2 walk test machine to contractors Gear Box then taken to set Gear Box back to believe after fixed by an 4.2 stored. Generating set up
4.1.To prepare 3 contractors equipment used in the Overhaul Gear Box and tools used in examination all
4.2. The details of the work to proceed
4.2 contractors.1 contractors will have the walk test (Test Run) while no Load (No Load Test) Luo the Overhaul Gear Box "HANSEN." By the test is
(1) Vibration in the Horizontal
(2) Vibration in the Vertical
(3) Vibration in the Axial
(4 Temperature.) Of Bearing
4.2.2 shall take off and cleaning contractors parts of the set and Gear Box inspection of parts within the series Gear Box if found damaged or not in any parts available. Contractor must inform the glowA note is written to the removable parts and return to the community. With analyzing the problems
4.2.3 contractors, must change the Spare Part of Gear Box and set Clearance of Bearing and the Backlash of series Bevel Gear Set. According to the standard HANSEN following for generating
(a) change Bearing (Spare Part of generatingAttached document number) 1 3 series, which in 1 set includes a
- pos.60.01 P / N U60-22232 EQJ number 1 A
- pos.60.02 P / N NJ 2232 E. The 1 A
- pos.60.03 P / N U60-22320 EQJ number 1 A
- pos.60.04 P / N U60-22320 EQJ number 1 A
- pos.60.09 P / N U60-31317. The body QQ 2
- pos.60.10 P / N X60-22318 EQJ number 1 one
.- pos.60.21 P / N U60-81232 QQ number 1 A
(b) change Oil seal (contractors, supply Spare Part) attached document 1 number 3 series. The 1 set includes a
- pos.65.02 P / N U65-1603115 number 1 A
- pos.65.09 P / N 268-9 RBV 80102 number 1 A
- pos.65.29. P / N 268-9 RBV 80102 number 1 one
.(c) the change and Bevel Gear Pinion (contractors, supply Spare Part) attached document 1 3 number series, which in 1 Series (pos.2934. P / N D29-0320B501) consists of a
- pos.2903 Gear P / N D 29-3251 B 001 number 1 A
- pos.2904 Pinion P / N D 29-3216 B 501 number 1 one
.(d) change Lube oil pump (Spare Part of EGAT) attached document 2 3 number series, which in 1 set includes a
- Item 1 Pump Gear. Set P / N 109-F351101 number 1 set
- Item 2 Pump cover o - ring seal Dia.109.5x3 number 1 A
- Item 3 Pump o - ring seal Dia.123x7. The 1 A
- Item 4 Bearing P / N HK 2516 number 1 one
.- Item 5 Bearing P / N 6005 number 1 A
- Cover number 1 A
- Housing number 1 A
- Shaft number 1 A
- Coupling. The 1 A
(E) change Fitter Element (Spare Part of EGAT) attached document 3 3 number series, which in 1 set consists of
- Item 3 Fitter. Element
.(f) the change Pinion Shaft (contractors, supply Spare Part) attached document 1 number 3 one
- pos.2702 Pinion P / N F 27-0716 B. 101
4.2.4 spray sand preparation work surface and color outside of the Gear Box using color Modify Epoxy is Primer (priming) and use of color Polyurethane. According to RAL.NO.6016 color Top Coat
4.2.5 contractors, need to report the performance Overhaul Gear Box and suggestions of how to maintain the series. Gear Box meet all standards of 3 version with Electronic File in the form CD number 3 sheets delivered at the Department. หบค สก-.In the send the document to the community have receipt delivery from contractors,
5. Determination condition equipment
.In order to correct bid contractors or close to the scope and requirements of the job. Bidder can listen to elucidate the job description and condition equipment according to the limit.Holding rights and benefits of bidder
.
6. Criteria price of reserves the right to consider if the wholesale price in bid documents are incomplete or incorrect as. Generating set, which must include the following documents
6.1 to bid form by the account calculation. The attached document 4
6.2 documents, certificate of work, ones according to 3
note if the Graca not attached warrant warranty period works. Or enter
.The warranty period the WAN according to Article 11 is considered the bidder to guarantee the conditions of generating 7
. กำหนดส่งมอบ timely within the 30 days since the date. EGAT let into action by generating contractorsNotice in writing at least 3 days. This does not count the generating order (except the order due to strike off work contractors is incorrect. The conditions of generating)
. Inspection 8.คณะกรรมการตรวจรับ work of the inspection by topic detection:
8.1 EGAT to check Overhaul Gear Box. Work shop of the contractors contractors have to notify the glowKnow in advance at least 3 days. Before the walk test (Test Run)
8.2 contractors, to check the neatness of the Gear Box repair work
8 before delivery.3 after the inspection of the contractor. If the repair was damaged to repair contractors new well as old
8.4 EGAT to check on the scope and the details of the article. 4.
.