Fai slow water.From the theory of forest restoration due to the initiative. By the use of water resources for maximum benefit with the creation of the fire resistant wet (Wet Fire Break) one of such methods is to build a dam to slow the moisture or called. Check Dam to block or a small stream channel periodically. To store water and sediment in some. The water stored will leak to accumulate in the soil. Make the moisture spread into both bank. A forest, his wet (2012), the office of the Special Coordinator for the project due to the initiative (located at) (2007). Said the weir weir weir slow water upstream water barrier. Check dam or weir slow moisture difference is the same thing, call in English. Check Dam is building block or blocking of the river, and from meeting located at 1st / 2004, were reported in the the royal order of his Majesty the king On the construction of the weir to slow the water. According to the project of center for the study of Huai Hong khrai Royal, DOI saket District, Chiang Mai province. That should be expanded to cover all areas.From the stream with both government and private organizations. Project in security 8.0 thousands of dams were 1) to slow the flow. To reduce the severity of the tide, and reduce the erosion of the riverbank. 2) help the waters in the Long Creek by only in the dry season. 3) help to trap sediment flowing with water to shallow downstream. Making water and with better quality 4) help the soil moist forests are abundant, increase biodiversity, fish and wildlife. Living water living. 5) back to the hill / mountain plant community bald. 6) when the soil moisture, ป่าก็ damp, become a fire line to reduce the severity of wildfires.Therefore, in order to security 8.0 give the best results for all parties and the negative impacts on environment and ecology in the original, and various creatures. Housing in the area to a minimum. It is necessary to have a thorough research PHE.
การแปล กรุณารอสักครู่..