The study found that the plan is a primary route in the North along the old railroad trains of South Thailand. Connect the suburban area on the north side (Don mueang pathum Thani rungsit) and the suburban areas to the South (bang Kapi Chai) into the heart of the city (the speaker), a distance of 80.8 km 36 station (the original) by integrating a journey together with long-distance rail system that can be linked to travel to regions. Network infrastructure to support the distribution of housing space to outer space, the concept of urban space. Supports the new Government Center, Bangkok Area community area chaengwattana road and RAM Indra being the high rate of growth in. Connected to the Don mueang airport, Rangsit, pathum Thani area the populace supported links to Royal Thai Rangsit area. In the future, can be linked to the wire above the bus terminal and the North-East. Projects can solve the intersection between road and rail in urban areas makes it possible to increase the efficiency of rail travel and reduce travel delays on the road network. SRT system Crimson color line include range-Sue-Sue Rangsit-Hua lamphong and bang Bon-bang Bon-Chai.
การแปล กรุณารอสักครู่..
