Example toilet testing raised and installation projects, 23 2 Rattanatibet on Aspire/2/58 must be the same format as the bathrooms that are used within the project.
For example the package to test the lifting and installation project Aspire Rattanatibet 2 on 23 / 2 / 58 must is the bathroom is a form like to use within the project.