-For pressure pipes When the installation has completed, has been tested with pressure in the pipe is approximately 80 pounds per square inch for a period of 24 hours. To test for leaks, especially pipes that will need to be established or existing plaster cover invisible leakage test, short range.
การแปล กรุณารอสักครู่..