However, there are guidelines to support in case of an operation not in accordance with the work plan. The company will enter into negotiations with the HPC to fix the problem and so do not cause significant effects from the operation as planned, such as in the second quarter improved 2 year 2559 the area soil and scattering soil grinder machine along the belt exceeds the duration.Planned, as above. The company cannot be sent through the soil, sprinkling soil on plans the company has been negotiating with access to HPC to make transport of soil, using trucks instead of belts during this period. It also has negotiated with the HPC to modify plans to dig a fur to meet throughput, which result from the above negotiations resulted in the company's ability to continue the excavation of a planned new hairs are to reduce the impact on the company.