The emissions from the project. In the construction and installation The main source is to transport materials for the construction of the wellhead of the project, the amount of fill material to be used in the construction of a total of 19,287 cubic meters, as shown in Table 2.8 to 1.
การแปล กรุณารอสักครู่..