I had to consult with his production team and don't have a problem with floor plans of ground clear but he will need to change the production Processed dry mix process, so try to use the Dry mix.
I have consulted with the production team did not have the issue of the production plan subsoil. But he worries that it will be replaced Processed Production is in the process of trying to use the dry mix Dry mix or not, which I would agree with you if the property does not need to be adjusted several times.
I have consulted with the production team, he does not have the problem of the production plan, soil washing But he was worried that must change Processed production is dry mix so in the process of experiment is used Dry mix.