Exterior primer is completed, an internal primer to 7th floor, waiting for the installation of air layer 5-6, waiting for installation of air conditioner.
Secondary Color external floor completed, Secondary Color within the level 7 floor, waiting for Install air level 5 - 6, are waiting for Install air conditioner